Flame-Free Refurbishment Tackles Complex Brewery Roof

26 November 2026
The Carlsberg Britvic Brewery roofscape
26 November 2026

The Carlsberg Britvic Brewery in Northampton is a complex, architecturally distinctive facility that presents significant technical challenges for roofing design and delivery. Designed in the 1970s and inspired by the form of a Danish longship, its roofscape is defined by steep vertical planes, complex geometry and extensive exposure.

When Carlsberg Britvic planned a major roof refurbishment, the requirement was clear. The project needed a technically robust, fully flame-free solution that could manage installation complexity at scale while delivering long-term performance. Garland UK was appointed as system designer and manufacturer, working directly for the client and providing full technical delivery oversight, alongside Garland UK Approved Contractor, Cambridge Flat Roofing.

The brief focused on upgrading more than 13,000 m² of existing roof coverings to improve waterproofing and durability across the brewery. The project required particular attention to extensive vertical slopes and detailed interfaces, where legacy construction and exposure increased long-term risk. The client required a fully flame-free specification compliant with NFRC Safe2Torch guidance and insurer requirements. Garland UK led the system design, detailing strategy and technical assurance throughout, supporting the client team and approved contractor from pre-construction through to completion.

The Carlsberg Britvic Brewery roofscape

141 Vertical Upstands

The challenge lay in both scale and complexity. The roof includes 141 individual vertical upstands, commonly referred to as ‘kit kats’, each acting as a termination point and restraint detail. Together, these created hundreds of linear metres of vertical waterproofing interfaces, all requiring individual consideration rather than standard detailing.

A strict no-hot-works policy applied across the live site, removing traditional torch-on installation methods entirely. Winter working conditions added further constraints, particularly around moisture management and sequencing, increasing the importance of precise installation control.

Long-term performance was critical. Vertical and steeply pitched surfaces required enhanced restraint to prevent membrane movement over time. In parallel, the roof needed to meet fire performance requirements and remain compatible with future upgrades, including potential solar installations.

The Carlsberg Britvic Brewery roofscape

Flame-Free Installation

Andrew Fox, Technical Manager at Garland UK designed a flame-free waterproofing solution using the StressPly Flex SA system. The system combines self-adhesive modified bitumen membranes, hot air welding and solvent-free adhesives, delivering full NFRC Safe2Torch compliance while maintaining high performance across horizontal and vertical applications.

The Carlsberg Britvic Brewery roofscapeAn A1 fire-rated, non-combustible board was incorporated into the build-up and mechanically fixed into the concrete deck. Garland UK coordinated site-specific pull-out testing to confirm fixing depth and performance, specifying stainless steel fixings to mitigate long-term corrosion risk.

All elements of the system were mechanically fixed. Restraint bars were installed at all head laps across the vertical upstands, providing restraint and protecting against future movement. In total, more than 4.5 km of restraint detailing was installed across the roof.

With hot works prohibited and winter conditions present, ETorches were used to manage moisture safely during installation. This flame-free drying method was essential to maintaining progress while eliminating fire risk, a key consideration on a live operational site where safety, continuity, and insurance compliance were critical. Garland UK managed the technical delivery throughout, coordinating detailing strategies with Cambridge Flat Roofing and maintaining strict quality control through regular site inspections.

Long-Term Protection

The refurbished roof now provides Carlsberg Britvic with a flame-free, technically robust waterproofing solution designed for long-term performance. The team fully addressed complex vertical detailing, eliminated membrane movement risk through comprehensive mechanical restraint, and met fire safety requirements without compromise.

Andrew Fox, Technical Manager at Garland UK, said: “This project demanded absolute technical control. The scale, vertical detailing, and no-hot-works restrictions meant every decision had to be right. By maintaining close technical oversight throughout installation, we delivered a flame-free solution that addresses long-term performance, fire safety and durability in equal measure.”

>> Read more about Garland UK in the news

Share article

Check out the latest issue

127 November – December 2026

Sign Up to
Roofing Today

Stay up to date with all of the latest news from Roofing Today by signing up to our weekly Bulletins…