Blenheim Palace Gears Up to Reveal its ‘Glow Up’

11 August 2026

Blenheim Palace roof

As the major roof repair of one of Britain’s most iconic landmarks comes to an end, Blenheim Palace is gearing up to reveal its ultimate ‘glow up’.

For the past two years, this monumental £12 million project has been underway to preserve the palace’s historic architecture and safeguard its heritage for future generations.

Now, as the scaffolding is taken down, the UNSECO World Heritage Site is finally restored to its former glory.

Glow Up

The prominent statue of Britannia can be seen once again standing atop the palace on the Oxfordshire skyline, and the Great Court’s columns are exposed, allowing visitors to see the recognisable view of the 300-year-old palace.

The Saloon will slowly be revealed in mid-August, with history-lovers having the opportunity to observe the final conservation works taking place on the lower wall paintings in September. At this time, a tunnel will be installed in the Great Hall to enable the covering and scaffold to be safely removed over the following weeks.

The final part of the restoration works happens out on the South Lawn, where the Louis XIV statue will sit entirely clear of wrap and scaffold, with the Blenheim Palace roofline rising gold behind it.

Major Roof Repair

The restoration work over the past two years has brought together incredible craftsmanship and intricate workmanship, including re-leading the roof, retaining and replacing slates across the Heights, Galleries, and Saloon, increasing the capacity of the gutters by over 300%.

Heather Carter, Managing Director of Blenheim Palace, said: “The success of this project is the result of an exceptional collaborative effort across a whole team of specialists, from our conservation engineers, architects and consultants to our project managers, heritage, operations and maintenance teams, all working together behind the scenes to protect and restore this extraordinary building for future generations. It’s been a massive effort.

“The project is not just about preserving our past; it’s about creating new ways for visitors to engage with our history now and well into the future. We’re looking forward to welcoming visitors to see Blenheim Palace’s ‘glow up’ and celebrate this monumental restoration. We are so grateful for the continued support of our visitors, whose contributions are vital to the success of the initiative.”

Blenheim Palace first opened its doors to the public 75 years ago to raise funds for essential roof conservation work. This pivotal £12m project ensured Britain’s Greatest Palace remains resilient against the elements that threaten its historical integrity. Every penny of visitor funds contributes directly to this conservation effort.

 >> Read more about the Blenheim Palace roof restoration in the news

Share article

Check out the latest issue

125 July-August 2026

Sign Up to
Roofing Today

Stay up to date with all of the latest news from Roofing Today by signing up to our weekly Bulletins…